3rd Party: Some Zoho CRM syncs are failing with timeout or premature EOF errors
- Impact
- Degraded
- Status
- Resolved after 5h 23m
- Affected
- Zoho CRM · us
What's happening
This incident has been resolved. Sync failure rates have returned to normal, and affected connections are syncing successfully. Incident Summary Description: Some Zoho CRM syncs were failing with timeout or premature EOF errors Timeline: The incident began on November 23, 2026, at 11:00 UTC and was resolved at 16:16 UTC. Cause: Zoho’s US data centre had network lag after an upgrade Resolution: The issue was fixed from Zoho side.
Fivetran,
What to do
Check whether you use Fivetran Zoho CRM in us. Check your stack.
Drop a package.json, lockfile, Terraform or a list of domains at down.guide to see every provider you depend on.Confirm your retries, queues and scheduled jobs caught up after the 5h 23m it lasted.
Anything that failed between 2026-11-23 12:50 UTC and 2026-11-23 18:13 UTC may need a replay.Subscribe to Fivetran's feed to hear about the next one first. RSS feed.
https://down.guide/feed?provider=fivetran works in Slack (/feed subscribe), Discord feed bots and any RSS reader.
Updates from Fivetran 4
- Resolved
This incident has been resolved. Sync failure rates have returned to normal, and affected connections are syncing successfully. Incident Summary Description: Some Zoho CRM syncs were failing with timeout or premature EOF errors Timeline: The incident began on November 23, 2026, at 11:00 UTC and was resolved at 16:16 UTC. Cause: Zoho’s US data centre had network lag after an upgrade Resolution: The issue was fixed from Zoho side.
- Monitoring
A fix has been implemented from Zoho side and we are monitoring the results.
- Identified
The issue remains ongoing. Syncs that rely on the third-party provider’s US data centres are still failing. We’re awaiting the provider’s response. Next Expected Update: 1 hour
- Identified
The issue has been identified, and we are working to resolve it. A disruption at a third-party provider is causing sync failures with timeout or premature EOF errors. For more information: https://zohostatus.com/index.html?dc=all
Reports count in aggregate; nothing about you is shown.
Questions about 3rd Party: Some Zoho CRM syncs are failing with timeout or premature EOF errors
Is Fivetran still down?
No, this incident was resolved 2026-11-23 18:13 UTC. For Fivetran's live state, see https://down.guide/providers/fivetran.
How long did it last?
5h 23m, from 2026-11-23 12:50 UTC to 2026-11-23 18:13 UTC, by the times Fivetran posted.
What was affected?
Fivetran named Zoho CRM in us.
What caused it?
Fivetran hasn't published a root cause. If it does, it shows here.
Where does this come from?
Fivetran's official status page, https://status.fivetran.com, quoted verbatim. down.guide's own probes, reports and social counts are labeled as ours.
Related
- 3rd Party: Some Jira connections are failing with one of the following errors: "Service is unavailable" or "Gateway Timeout." (Nov 23, 2026)
- Fivetran: Sync failures for Stripe and Stripe Test connectors (Nov 21, 2026)
- 3rd Party: Facebook Pages connections are failing with the error: “An error has occurred (Nov 20, 2026)
- Fivetran: Transient Connector Sync Failures Across All Regions (Nov 19, 2026)
- 3rd Party: Apple App Store (iTunes) Connections Failing Due to Source-Side API Outage (Nov 17, 2026)
No corrections so far. Something wrong on this page? Report an error or send us a note.